FM 511 over Ccdd #1 Main Ditch
GoodCameron County, Texas · 0.07 MI SE of SH 48 · Structure no. 210310068401011
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected March 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 80 ft
- 1 main span
- Daily traffic
- 12,918
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
FM 511 over Ccdd #1 Main Ditch is a prestressed concrete box beam or girders - multiple carrying FM 511 over Ccdd #1 Main Ditch in Cameron County, Texas. It was built in 2003, so it is 22 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 12,918 vehicles a day, roughly 15% of them trucks, projected to reach 13,170 by 2033. The structure is 80 ft (24.4 m) long and 84 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 511 over Ccdd #1 Main Ditch built?
It was built in 2003, making it 22 years old in 2025.
What condition is FM 511 over Ccdd #1 Main Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does FM 511 over Ccdd #1 Main Ditch carry?
About 12,918 vehicles per day (2023 count), of which roughly 15% are trucks.
How long is FM 511 over Ccdd #1 Main Ditch?
The structure is 80 ft (24.4 m) long with a longest span of 80 ft (24.4 m) and a deck 84 ft wide.
Who owns FM 511 over Ccdd #1 Main Ditch?
It is owned by the State Highway Agency.