Clear Fork ST over Trib to Clr Fk Plum Crk
FairCaldwell County, Texas · 0.35 MI SW of San Jacinto · Structure no. 140280B00150001
- Built
- 2002
- 23 years old
- Condition
- Fair
- inspected January 2024
- Type
- Culvert
- Concrete
- Length
- 35 ft
- 4 main spans
- Daily traffic
- 1,718
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Clear Fork ST over Trib to Clr Fk Plum Crk is a concrete culvert carrying Clear Fork ST over Trib to Clr Fk Plum Crk in Caldwell County, Texas. It was built in 2002, so it is 23 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,718 vehicles a day, roughly 3% of them trucks, projected to reach 2,405 by 2042. The structure is 35 ft (10.7 m) long and 47 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Clear Fork ST over Trib to Clr Fk Plum Crk built?
It was built in 2002, making it 23 years old in 2025.
What condition is Clear Fork ST over Trib to Clr Fk Plum Crk in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Clear Fork ST over Trib to Clr Fk Plum Crk carry?
About 1,718 vehicles per day (2020 count), of which roughly 3% are trucks.
How long is Clear Fork ST over Trib to Clr Fk Plum Crk?
The structure is 35 ft (10.7 m) long with a longest span of 8 ft (2.4 m) and a deck 47 ft wide.
Who owns Clear Fork ST over Trib to Clr Fk Plum Crk?
It is owned by the City or Municipal Highway Agency.