CR 213 (robin Rch) over Clear Fork Plum Creek
GoodCaldwell County, Texas · 0.60 MI SW of US 183 · Structure no. 140280AA0345002
- Built
- 1997
- 28 years old
- Condition
- Good
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 100 ft
- 1 main span
- Daily traffic
- 438
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
CR 213 (robin Rch) over Clear Fork Plum Creek is a prestressed concrete stringer/multi-beam or girder carrying CR 213 (robin Rch) over Clear Fork Plum Creek in Caldwell County, Texas. It was built in 1997, so it is 28 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 438 vehicles a day, roughly 3% of them trucks, projected to reach 78 by 2042. The structure is 100 ft (30.5 m) long and 26 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 213 (robin Rch) over Clear Fork Plum Creek built?
It was built in 1997, making it 28 years old in 2025.
What condition is CR 213 (robin Rch) over Clear Fork Plum Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does CR 213 (robin Rch) over Clear Fork Plum Creek carry?
About 438 vehicles per day (2020 count), of which roughly 3% are trucks.
How long is CR 213 (robin Rch) over Clear Fork Plum Creek?
The structure is 100 ft (30.5 m) long with a longest span of 50 ft (15.2 m) and a deck 26 ft wide.
Who owns CR 213 (robin Rch) over Clear Fork Plum Creek?
It is owned by the County Highway Agency.