US Bridges

SH 130 NB Ml over FM 2001

Good

Caldwell County, Texas · 1.7 MI SW of US 183 · Structure no. 140280358301047

Built
2011
14 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
323 ft
3 main spans
Daily traffic
18,351
2010 count
Owner
State
State Highway Agency

About this bridge

SH 130 NB Ml over FM 2001 is a prestressed concrete stringer/multi-beam or girder carrying SH 130 NB Ml over FM 2001 in Caldwell County, Texas. It was built in 2011, so it is 14 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,351 vehicles a day, roughly 15% of them trucks, projected to reach 46,745 by 2030. The structure is 323 ft (98.5 m) long and 42 ft wide.

CarriesSH 130 NB Ml
CrossesFM 2001
Location1.7 MI SW of US 183
StateTexas
Coordinates29.90011, -97.70252
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHL 93
Structure length323 ft (98.5 m)
Longest span125 ft (38.1 m)
Deck width42 ft (12.8 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,351 (2010)
Projected traffic46,745 by 2030
Trucks15%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH 130 NB Ml over FM 2001 built?

It was built in 2011, making it 14 years old in 2025.

What condition is SH 130 NB Ml over FM 2001 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does SH 130 NB Ml over FM 2001 carry?

About 18,351 vehicles per day (2010 count), of which roughly 15% are trucks.

How long is SH 130 NB Ml over FM 2001?

The structure is 323 ft (98.5 m) long with a longest span of 125 ft (38.1 m) and a deck 42 ft wide.

Who owns SH 130 NB Ml over FM 2001?

It is owned by the State Highway Agency and maintained by the State Toll Authority.