US Bridges

CR 200 over N Fork San Gabriel River

Good

Burnet County, Texas · 3.1 MI S of FM 963 · Structure no. 140270AA0634002

Built
2000
25 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
144 ft
1 main span
Daily traffic
181
2020 count
Owner
County
County Highway Agency

About this bridge

CR 200 over N Fork San Gabriel River is a prestressed concrete stringer/multi-beam or girder carrying CR 200 over N Fork San Gabriel River in Burnet County, Texas. It was built in 2000, so it is 25 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 181 vehicles a day, roughly 3% of them trucks, projected to reach 900 by 2042. The structure is 144 ft (43.9 m) long and 26 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesCR 200
CrossesN Fork San Gabriel River
Location3.1 MI S of FM 963
RouteCounty Highway 200
StateTexas
Coordinates30.82459, -98.03228
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1 (+1 approach)
Design loadHS 20
Structure length144 ft (43.9 m)
Longest span85 ft (25.9 m)
Deck width26 ft (7.8 m)
Roadway width23 ft (7.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic181 (2020)
Projected traffic900 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 200 over N Fork San Gabriel River built?

It was built in 2000, making it 25 years old in 2025.

What condition is CR 200 over N Fork San Gabriel River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does CR 200 over N Fork San Gabriel River carry?

About 181 vehicles per day (2020 count), of which roughly 3% are trucks.

How long is CR 200 over N Fork San Gabriel River?

The structure is 144 ft (43.9 m) long with a longest span of 85 ft (25.9 m) and a deck 26 ft wide.

Who owns CR 200 over N Fork San Gabriel River?

It is owned by the County Highway Agency.