FM 1176 over E Fork Clear Creek Rel
GoodBrown County, Texas · 3.55 MI W of US 377 · Structure no. 230250136505005
- Built
- 1954
- 71 years old, rebuilt 1997
- Condition
- Good
- inspected March 2024
- Type
- Slab
- Concrete
- Length
- 100 ft
- 4 main spans
- Daily traffic
- 345
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
FM 1176 over E Fork Clear Creek Rel is a concrete slab carrying FM 1176 over E Fork Clear Creek Rel in Brown County, Texas. It was built in 1954 and reconstructed in 1997, so it is 71 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 345 vehicles a day, roughly 16% of them trucks, projected to reach 479 by 2038. The structure is 100 ft (30.5 m) long and 30 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 1176 over E Fork Clear Creek Rel built?
It was built in 1954, making it 71 years old in 2025. It was reconstructed in 1997.
What condition is FM 1176 over E Fork Clear Creek Rel in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does FM 1176 over E Fork Clear Creek Rel carry?
About 345 vehicles per day (2020 count), of which roughly 16% are trucks.
How long is FM 1176 over E Fork Clear Creek Rel?
The structure is 100 ft (30.5 m) long with a longest span of 25 ft (7.6 m) and a deck 30 ft wide.
Who owns FM 1176 over E Fork Clear Creek Rel?
It is owned by the State Highway Agency.