US Bridges

Millican Meadows C over Peach Creek Relief

Good

Brazos County, Texas · 0.1 MI W of SH 6 Wfr · Structure no. 170210AA0006001

Built
2017
8 years old
Condition
Good
inspected September 2023
Type
Culvert
Concrete
Length
43 ft
4 main spans
Daily traffic
49
2022 count
Owner
County
County Highway Agency

About this bridge

Millican Meadows C over Peach Creek Relief is a concrete culvert carrying Millican Meadows C over Peach Creek Relief in Brazos County, Texas. It was built in 2017, so it is 8 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 49 vehicles a day, roughly 3% of them trucks, projected to reach 49 by 2042. The structure is 43 ft (13.1 m) long and 74 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesMillican Meadows C
CrossesPeach Creek Relief
Location0.1 MI W of SH 6 Wfr
RouteCounty Highway 0
StateTexas
Coordinates30.51377, -96.21013
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHL 93
Structure length43 ft (13.1 m)
Longest span10 ft (3 m)
Deck width74 ft (22.6 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic49 (2022)
Projected traffic49 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Millican Meadows C over Peach Creek Relief built?

It was built in 2017, making it 8 years old in 2025.

What condition is Millican Meadows C over Peach Creek Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Millican Meadows C over Peach Creek Relief carry?

About 49 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is Millican Meadows C over Peach Creek Relief?

The structure is 43 ft (13.1 m) long with a longest span of 10 ft (3 m) and a deck 74 ft wide.

Who owns Millican Meadows C over Peach Creek Relief?

It is owned by the County Highway Agency.