SH 21 EB over Thompson Creek Relief
GoodBrazos County, Texas · 2.7 MI SW of FM 2818 · Structure no. 170210011604032
- Built
- 1957
- 68 years old
- Condition
- Good
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 152 ft
- 5 main spans
- Daily traffic
- 4,981
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
SH 21 EB over Thompson Creek Relief is a concrete stringer/multi-beam or girder carrying SH 21 EB over Thompson Creek Relief in Brazos County, Texas. It was built in 1957, so it is 68 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,981 vehicles a day, roughly 12% of them trucks, projected to reach 6,680 by 2033. The structure is 152 ft (46.3 m) long and 31 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 21 EB over Thompson Creek Relief built?
It was built in 1957, making it 68 years old in 2025.
What condition is SH 21 EB over Thompson Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does SH 21 EB over Thompson Creek Relief carry?
About 4,981 vehicles per day (2020 count), of which roughly 12% are trucks.
How long is SH 21 EB over Thompson Creek Relief?
The structure is 152 ft (46.3 m) long with a longest span of 30 ft (9.1 m) and a deck 31 ft wide.
Who owns SH 21 EB over Thompson Creek Relief?
It is owned by the State Highway Agency.