US Bridges

SH 6 over Spring Creek

Fair

Brazos County, Texas · 3.64 MI SE of FM 2818 · Structure no. 170210005002008

Built
1932
93 years old, rebuilt 1990
Condition
Fair
inspected February 2023
Type
Tee Beam
Concrete
Length
98 ft
4 main spans
Daily traffic
37,905
2019 count
Owner
State
State Highway Agency

About this bridge

SH 6 over Spring Creek is a concrete tee beam carrying SH 6 over Spring Creek in Brazos County, Texas. It was built in 1932 and reconstructed in 1990, so it is 93 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 37,905 vehicles a day, roughly 14% of them trucks, projected to reach 36,160 by 2033. The structure is 98 ft (29.9 m) long and 94 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesSH 6
CrossesSpring Creek
Location3.64 MI SE of FM 2818
RouteState Highway 6
StateTexas
Coordinates30.5638, -96.26342
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57 US tons
Inventory rating34 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadH 20
Structure length98 ft (29.9 m)
Longest span24 ft (7.3 m)
Deck width94 ft (28.7 m)
Roadway width89 ft (27.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic37,905 (2019)
Projected traffic36,160 by 2033
Trucks14%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 6 over Spring Creek built?

It was built in 1932, making it 93 years old in 2025. It was reconstructed in 1990.

What condition is SH 6 over Spring Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does SH 6 over Spring Creek carry?

About 37,905 vehicles per day (2019 count), of which roughly 14% are trucks.

How long is SH 6 over Spring Creek?

The structure is 98 ft (29.9 m) long with a longest span of 24 ft (7.3 m) and a deck 94 ft wide.

Who owns SH 6 over Spring Creek?

It is owned by the State Highway Agency.