CR 108 (max Rd) NB over Hickory Slough
GoodBrazoria County, Texas · 0.55 MI N of FM 518 · Structure no. 120200M00395001
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected August 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 60 ft
- 1 main span
- Daily traffic
- 840
- 2011 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
CR 108 (max Rd) NB over Hickory Slough is a prestressed concrete box beam or girders - multiple carrying CR 108 (max Rd) NB over Hickory Slough in Brazoria County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 840 vehicles a day, roughly 10% of them trucks, projected to reach 1,600 by 2031. The structure is 60 ft (18.3 m) long and 27 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 108 (max Rd) NB over Hickory Slough built?
It was built in 2018, making it 7 years old in 2025.
What condition is CR 108 (max Rd) NB over Hickory Slough in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does CR 108 (max Rd) NB over Hickory Slough carry?
About 840 vehicles per day (2011 count), of which roughly 10% are trucks.
How long is CR 108 (max Rd) NB over Hickory Slough?
The structure is 60 ft (18.3 m) long with a longest span of 60 ft (18.3 m) and a deck 27 ft wide.
Who owns CR 108 (max Rd) NB over Hickory Slough?
It is owned by the Town or Township Highway Agency.