Southfork DR EB over Detention Ditch
GoodBrazoria County, Texas · 0.25MI W of Old Choc Byu · Structure no. 120200AA2006002
- Built
- 2011
- 14 years old
- Condition
- Good
- inspected August 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 45 ft
- 1 main span
- Daily traffic
- 1,500
- 2011 count
- Owner
- County
- County Highway Agency
About this bridge
Southfork DR EB over Detention Ditch is a prestressed concrete box beam or girders - multiple carrying Southfork DR EB over Detention Ditch in Brazoria County, Texas. It was built in 2011, so it is 14 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,500 vehicles a day, projected to reach 3,000 by 2031. The structure is 45 ft (13.7 m) long and 32 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Southfork DR EB over Detention Ditch built?
It was built in 2011, making it 14 years old in 2025.
What condition is Southfork DR EB over Detention Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does Southfork DR EB over Detention Ditch carry?
About 1,500 vehicles per day (2011 count).
How long is Southfork DR EB over Detention Ditch?
The structure is 45 ft (13.7 m) long with a longest span of 43 ft (13.1 m) and a deck 32 ft wide.
Who owns Southfork DR EB over Detention Ditch?
It is owned by the County Highway Agency.