US Bridges

CR 227 over Gcwa Canal

Good

Brazoria County, Texas · 2.25 MI S of FM 2004 · Structure no. 120200AA0887003

Built
2017
8 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
100 ft
1 main span
Daily traffic
905
2017 count
Owner
County
County Highway Agency

About this bridge

CR 227 over Gcwa Canal is a prestressed concrete stringer/multi-beam or girder carrying CR 227 over Gcwa Canal in Brazoria County, Texas. It was built in 2017, so it is 8 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 905 vehicles a day, roughly 1% of them trucks, projected to reach 1,217 by 2037. The structure is 100 ft (30.5 m) long and 32 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesCR 227
CrossesGcwa Canal
Location2.25 MI S of FM 2004
RouteCounty Highway 227
StateTexas
Coordinates29.14284, -95.25949
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+1 approach)
Design loadHL 93
Structure length100 ft (30.5 m)
Longest span65 ft (19.8 m)
Deck width32 ft (9.8 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic905 (2017)
Projected traffic1,217 by 2037
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 227 over Gcwa Canal built?

It was built in 2017, making it 8 years old in 2025.

What condition is CR 227 over Gcwa Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does CR 227 over Gcwa Canal carry?

About 905 vehicles per day (2017 count), of which roughly 1% are trucks.

How long is CR 227 over Gcwa Canal?

The structure is 100 ft (30.5 m) long with a longest span of 65 ft (19.8 m) and a deck 32 ft wide.

Who owns CR 227 over Gcwa Canal?

It is owned by the County Highway Agency.