CR 129 over Drainage Ditch
GoodBrazoria County, Texas · 1.00 MI NE of SH 35 · Structure no. 120200AA0663002
- Built
- 1998
- 27 years old
- Condition
- Good
- inspected August 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 70 ft
- 1 main span
- Daily traffic
- 6,866
- 2016 count
- Owner
- County
- County Highway Agency
About this bridge
CR 129 over Drainage Ditch is a prestressed concrete box beam or girders - multiple carrying CR 129 over Drainage Ditch in Brazoria County, Texas. It was built in 1998, so it is 27 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,866 vehicles a day, roughly 2% of them trucks, projected to reach 3,880 by 2031. The structure is 70 ft (21.3 m) long and 31 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 129 over Drainage Ditch built?
It was built in 1998, making it 27 years old in 2025.
What condition is CR 129 over Drainage Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does CR 129 over Drainage Ditch carry?
About 6,866 vehicles per day (2016 count), of which roughly 2% are trucks.
How long is CR 129 over Drainage Ditch?
The structure is 70 ft (21.3 m) long with a longest span of 69 ft (21 m) and a deck 31 ft wide.
Who owns CR 129 over Drainage Ditch?
It is owned by the County Highway Agency.