US Bridges

CR 58 over Drainage Ditch

Good

Brazoria County, Texas · 1.20 MI W of SH 288 · Structure no. 120200AA0536001

Built
2011
14 years old
Condition
Good
inspected August 2023
Type
Culvert
Concrete
Length
23 ft
2 main spans
Daily traffic
4,818
2016 count
Owner
County
County Highway Agency

About this bridge

CR 58 over Drainage Ditch is a concrete culvert carrying CR 58 over Drainage Ditch in Brazoria County, Texas. It was built in 2011, so it is 14 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,818 vehicles a day, projected to reach 400 by 2031. The structure is 23 ft (7 m) long. If it were closed, the detour would be 6.8 mi (11 km).

CarriesCR 58
CrossesDrainage Ditch
Location1.20 MI W of SH 288
RouteCounty Highway 58
StateTexas
Coordinates29.51202, -95.39959
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadUnknown
Structure length23 ft (7 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,818 (2016)
Projected traffic400 by 2031
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 58 over Drainage Ditch built?

It was built in 2011, making it 14 years old in 2025.

What condition is CR 58 over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does CR 58 over Drainage Ditch carry?

About 4,818 vehicles per day (2016 count).

How long is CR 58 over Drainage Ditch?

The structure is 23 ft (7 m) long with a longest span of 10 ft (3 m).

Who owns CR 58 over Drainage Ditch?

It is owned by the County Highway Agency.