US Bridges

CR 81 over W Fork Chocolate Bayou

Good

Brazoria County, Texas · 0.60 MI W of CR 48 · Structure no. 120200AA0510001

Built
2011
14 years old
Condition
Good
inspected September 2023
Type
Other
Prestressed Concrete
Length
55 ft
1 main span
Daily traffic
80
2011 count
Owner
County
County Highway Agency

About this bridge

CR 81 over W Fork Chocolate Bayou is a prestressed concrete other carrying CR 81 over W Fork Chocolate Bayou in Brazoria County, Texas. It was built in 2011, so it is 14 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 80 vehicles a day, projected to reach 150 by 2031. The structure is 55 ft (16.8 m) long and 30 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCR 81
CrossesW Fork Chocolate Bayou
Location0.60 MI W of CR 48
RouteCounty Highway 81
StateTexas
Coordinates29.46827, -95.42503
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeOther
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length55 ft (16.8 m)
Longest span55 ft (16.8 m)
Deck width30 ft (9.2 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic80 (2011)
Projected traffic150 by 2031
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 81 over W Fork Chocolate Bayou built?

It was built in 2011, making it 14 years old in 2025.

What condition is CR 81 over W Fork Chocolate Bayou in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does CR 81 over W Fork Chocolate Bayou carry?

About 80 vehicles per day (2011 count).

How long is CR 81 over W Fork Chocolate Bayou?

The structure is 55 ft (16.8 m) long with a longest span of 55 ft (16.8 m) and a deck 30 ft wide.

Who owns CR 81 over W Fork Chocolate Bayou?

It is owned by the County Highway Agency.