FM 2611 over San Bernard Rvr CR 659
GoodBrazoria County, Texas · 3.4 MI SW of Hw 36 · Structure no. 120200252402004
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,687 ft
- 13 main spans
- Daily traffic
- 5,200
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
FM 2611 over San Bernard Rvr CR 659 is a prestressed concrete stringer/multi-beam or girder carrying FM 2611 over San Bernard Rvr CR 659 in Brazoria County, Texas. It was built in 2022, so it is 3 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,200 vehicles a day, roughly 14% of them trucks, projected to reach 1 by 1900. The structure is 1,687 ft (514.2 m) long and 47 ft wide. If it were closed, the detour would be 16.2 mi (26 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 2611 over San Bernard Rvr CR 659 built?
It was built in 2022, making it 3 years old in 2025.
What condition is FM 2611 over San Bernard Rvr CR 659 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does FM 2611 over San Bernard Rvr CR 659 carry?
About 5,200 vehicles per day (2017 count), of which roughly 14% are trucks.
How long is FM 2611 over San Bernard Rvr CR 659?
The structure is 1,687 ft (514.2 m) long with a longest span of 145 ft (44.2 m) and a deck 47 ft wide.
Who owns FM 2611 over San Bernard Rvr CR 659?
It is owned by the State Highway Agency and maintained by the County Highway Agency.