FM 2234 over Clear Creek Relief
GoodBrazoria County, Texas · 1.40 MI W of SH 288 · Structure no. 120200210502003
- Built
- 1990
- 35 years old, rebuilt 2012
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 112 ft
- 3 main spans
- Daily traffic
- 33,329
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
FM 2234 over Clear Creek Relief is a prestressed concrete stringer/multi-beam or girder carrying FM 2234 over Clear Creek Relief in Brazoria County, Texas. It was built in 1990 and reconstructed in 2012, so it is 35 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 33,329 vehicles a day, roughly 4% of them trucks, projected to reach 38,110 by 2033. The structure is 112 ft (34.1 m) long and 92 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FM 2234 over Clear Creek Relief built?
It was built in 1990, making it 35 years old in 2025. It was reconstructed in 2012.
What condition is FM 2234 over Clear Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does FM 2234 over Clear Creek Relief carry?
About 33,329 vehicles per day (2016 count), of which roughly 4% are trucks.
How long is FM 2234 over Clear Creek Relief?
The structure is 112 ft (34.1 m) long with a longest span of 40 ft (12.2 m) and a deck 92 ft wide.
Who owns FM 2234 over Clear Creek Relief?
It is owned by the State Highway Agency.