US Bridges

SH 332 WB over Plantation Dr.

Good

Brazoria County, Texas · 2.1 MI SE of JCT SH 288 · Structure no. 120200152401075

Built
2012
13 years old
Condition
Good
inspected December 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
974 ft
9 main spans
Daily traffic
30,690
2010 count
Owner
State
State Highway Agency

About this bridge

SH 332 WB over Plantation Dr. is a prestressed concrete stringer/multi-beam or girder carrying SH 332 WB over Plantation Dr. in Brazoria County, Texas. It was built in 2012, so it is 13 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30,690 vehicles a day, roughly 19% of them trucks, projected to reach 42,970 by 2030. The structure is 974 ft (296.9 m) long and 42 ft wide.

CarriesSH 332 WB
CrossesPlantation Dr.
Location2.1 MI SE of JCT SH 288
RouteState Highway 332
StateTexas
Coordinates29.021, -95.43501
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans9
Design loadHL 93
Structure length974 ft (296.9 m)
Longest span124 ft (37.8 m)
Deck width42 ft (12.9 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30,690 (2010)
Projected traffic42,970 by 2030
Trucks19%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH 332 WB over Plantation Dr. built?

It was built in 2012, making it 13 years old in 2025.

What condition is SH 332 WB over Plantation Dr. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does SH 332 WB over Plantation Dr. carry?

About 30,690 vehicles per day (2010 count), of which roughly 19% are trucks.

How long is SH 332 WB over Plantation Dr.?

The structure is 974 ft (296.9 m) long with a longest span of 124 ft (37.8 m) and a deck 42 ft wide.

Who owns SH 332 WB over Plantation Dr.?

It is owned by the State Highway Agency.