US Bridges

SH 36 over Brazos River Relief

Good

Brazoria County, Texas · 6.25 MI E of FM 2004 · Structure no. 120200018806347

Built
2023
2 years old
Condition
Good
inspected November 2024
Type
Culvert
Concrete
Length
48 ft
6 main spans
Daily traffic
4,658
2023 count
Owner
State
State Highway Agency

About this bridge

SH 36 over Brazos River Relief is a concrete culvert carrying SH 36 over Brazos River Relief in Brazoria County, Texas. It was built in 2023, so it is 2 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,658 vehicles a day, roughly 11% of them trucks, projected to reach 6,310 by 2033. The structure is 48 ft (14.5 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSH 36
CrossesBrazos River Relief
Location6.25 MI E of FM 2004
RouteState Highway 36
StateTexas
Coordinates28.96818, -95.41634
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans6
Design loadHL 93
Structure length48 ft (14.5 m)
Longest span6 ft (1.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,658 (2023)
Projected traffic6,310 by 2033
Trucks11%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 36 over Brazos River Relief built?

It was built in 2023, making it 2 years old in 2025.

What condition is SH 36 over Brazos River Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does SH 36 over Brazos River Relief carry?

About 4,658 vehicles per day (2023 count), of which roughly 11% are trucks.

How long is SH 36 over Brazos River Relief?

The structure is 48 ft (14.5 m) long with a longest span of 6 ft (1.8 m).

Who owns SH 36 over Brazos River Relief?

It is owned by the State Highway Agency.