SH 35 over Drainage Ditch
FairBrazoria County, Texas · 0.25 MI W of SH 288 · Structure no. 120200017901075
- Built
- 1987
- 38 years old, rebuilt 2006
- Condition
- Fair
- inspected September 2024
- Type
- Slab
- Concrete Continuous
- Length
- 125 ft
- 5 main spans
- Daily traffic
- 15,451
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SH 35 over Drainage Ditch is a concrete continuous slab carrying SH 35 over Drainage Ditch in Brazoria County, Texas. It was built in 1987 and reconstructed in 2006, so it is 38 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,451 vehicles a day, roughly 9% of them trucks, projected to reach 7,870 by 2033. The structure is 125 ft (38.1 m) long and 97 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 35 over Drainage Ditch built?
It was built in 1987, making it 38 years old in 2025. It was reconstructed in 2006.
What condition is SH 35 over Drainage Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does SH 35 over Drainage Ditch carry?
About 15,451 vehicles per day (2023 count), of which roughly 9% are trucks.
How long is SH 35 over Drainage Ditch?
The structure is 125 ft (38.1 m) long with a longest span of 25 ft (7.6 m) and a deck 97 ft wide.
Who owns SH 35 over Drainage Ditch?
It is owned by the State Highway Agency.