SH 98 over Draw
GoodBowie County, Texas · 0.80 MI S of IH 30 · Structure no. 190190252601002
- Built
- 1961
- 64 years old
- Condition
- Good
- inspected July 2024
- Type
- Culvert
- Concrete
- Length
- 30 ft
- 3 main spans
- Daily traffic
- 1,912
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SH 98 over Draw is a concrete culvert carrying SH 98 over Draw in Bowie County, Texas. It was built in 1961, so it is 64 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,912 vehicles a day, roughly 36% of them trucks, projected to reach 3,210 by 2033. The structure is 30 ft (9.1 m) long. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 98 over Draw built?
It was built in 1961, making it 64 years old in 2025.
What condition is SH 98 over Draw in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does SH 98 over Draw carry?
About 1,912 vehicles per day (2023 count), of which roughly 36% are trucks.
How long is SH 98 over Draw?
The structure is 30 ft (9.1 m) long with a longest span of 9 ft (2.7 m).
Who owns SH 98 over Draw?
It is owned by the State Highway Agency.