US Bridges

FM 561 over IH 30

Good

Bowie County, Texas · 3.5 MI E of US 259 · Structure no. 190190061005170

Built
1971
54 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
380 ft
2 main spans
Daily traffic
278
2022 count
Owner
State
State Highway Agency

About this bridge

FM 561 over IH 30 is a prestressed concrete stringer/multi-beam or girder carrying FM 561 over IH 30 in Bowie County, Texas. It was built in 1971, so it is 54 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 278 vehicles a day, roughly 15% of them trucks, projected to reach 389 by 2042. The structure is 380 ft (115.8 m) long and 46 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesFM 561
CrossesIH 30
Location3.5 MI E of US 259
RouteState Highway 561
StateTexas
Coordinates33.36696, -94.63169
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61 US tons
Inventory rating29 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2 (+3 approach)
Design loadH 20
Structure length380 ft (115.8 m)
Longest span105 ft (32 m)
Deck width46 ft (13.9 m)
Roadway width42 ft (12.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic278 (2022)
Projected traffic389 by 2042
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FM 561 over IH 30 built?

It was built in 1971, making it 54 years old in 2025.

What condition is FM 561 over IH 30 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does FM 561 over IH 30 carry?

About 278 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is FM 561 over IH 30?

The structure is 380 ft (115.8 m) long with a longest span of 105 ft (32 m) and a deck 46 ft wide.

Who owns FM 561 over IH 30?

It is owned by the State Highway Agency.