US Bridges

IH 369 SB over UPRR & Findley ST

Good

Bowie County, Texas · 1.10 MI S of US 67 · Structure no. 190190021802051

Built
1981
44 years old
Condition
Good
inspected June 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
330 ft
5 main spans
Daily traffic
10,000
2013 count
Owner
State
State Highway Agency

About this bridge

IH 369 SB over UPRR & Findley ST is a prestressed concrete stringer/multi-beam or girder carrying IH 369 SB over UPRR & Findley ST in Bowie County, Texas. It was built in 1981, so it is 44 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,000 vehicles a day, roughly 3% of them trucks, projected to reach 14,000 by 2033. The structure is 330 ft (100.6 m) long and 40 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesIH 369 SB
CrossesUPRR & Findley ST
Location1.10 MI S of US 67
RouteInterstate 369
StateTexas
Coordinates33.40241, -94.09794
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length330 ft (100.6 m)
Longest span70 ft (21.3 m)
Deck width40 ft (12.3 m)
Roadway width38 ft (11.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,000 (2013)
Projected traffic14,000 by 2033
Trucks3%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway and railroad
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 369 SB over UPRR & Findley ST built?

It was built in 1981, making it 44 years old in 2025.

What condition is IH 369 SB over UPRR & Findley ST in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2022.

How much traffic does IH 369 SB over UPRR & Findley ST carry?

About 10,000 vehicles per day (2013 count), of which roughly 3% are trucks.

How long is IH 369 SB over UPRR & Findley ST?

The structure is 330 ft (100.6 m) long with a longest span of 70 ft (21.3 m) and a deck 40 ft wide.

Who owns IH 369 SB over UPRR & Findley ST?

It is owned by the State Highway Agency.