US Bridges

US 259 over Holly Creek

Good

Bowie County, Texas · 1.50 MI N of Morris C/L · Structure no. 190190008502044

Built
1995
30 years old
Condition
Good
inspected June 2024
Type
Culvert
Concrete
Length
45 ft
4 main spans
Daily traffic
1,631
2020 count
Owner
State
State Highway Agency

About this bridge

US 259 over Holly Creek is a concrete culvert carrying US 259 over Holly Creek in Bowie County, Texas. It was built in 1995, so it is 30 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,631 vehicles a day, roughly 29% of them trucks, projected to reach 2,470 by 2033. The structure is 45 ft (13.7 m) long. If it were closed, the detour would be 29.2 mi (47 km).

CarriesUS 259
CrossesHolly Creek
Location1.50 MI N of Morris C/L
RouteU.S. Route 259
StateTexas
Coordinates33.32766, -94.71648
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHS 20
Structure length45 ft (13.7 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,631 (2020)
Projected traffic2,470 by 2033
Trucks29%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed29.2 mi (47 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 259 over Holly Creek built?

It was built in 1995, making it 30 years old in 2025.

What condition is US 259 over Holly Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does US 259 over Holly Creek carry?

About 1,631 vehicles per day (2020 count), of which roughly 29% are trucks.

How long is US 259 over Holly Creek?

The structure is 45 ft (13.7 m) long with a longest span of 10 ft (3 m).

Who owns US 259 over Holly Creek?

It is owned by the State Highway Agency.