US Bridges

Cibolo Springs over Drainage Ditch

Good

Bexar County, Texas · 0.26 MI N of Graytown RD · Structure no. 150150M09923013

Built
2023
2 years old
Condition
Good
inspected December 2024
Type
Culvert
Concrete
Length
22 ft
4 main spans
Daily traffic
309
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Cibolo Springs over Drainage Ditch is a concrete culvert carrying Cibolo Springs over Drainage Ditch in Bexar County, Texas. It was built in 2023, so it is 2 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 309 vehicles a day, roughly 3% of them trucks, projected to reach 309 by 2042. The structure is 22 ft (6.6 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCibolo Springs
CrossesDrainage Ditch
Location0.26 MI N of Graytown RD
RouteCity Street 0
StateTexas
Coordinates29.49144, -98.2766
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionDecember 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadUnknown
Structure length22 ft (6.6 m)
Longest span4 ft (1.2 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic309 (2020)
Projected traffic309 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cibolo Springs over Drainage Ditch built?

It was built in 2023, making it 2 years old in 2025.

What condition is Cibolo Springs over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.

How much traffic does Cibolo Springs over Drainage Ditch carry?

About 309 vehicles per day (2020 count), of which roughly 3% are trucks.

How long is Cibolo Springs over Drainage Ditch?

The structure is 22 ft (6.6 m) long with a longest span of 4 ft (1.2 m).

Who owns Cibolo Springs over Drainage Ditch?

It is owned by the City or Municipal Highway Agency.