US Bridges

Binz-Engleman RD over Rosillo Creek

Fair

Bexar County, Texas · 0.20 MI E of Ackerman RD · Structure no. 150150H00245001

Built
1985
40 years old
Condition
Fair
inspected May 2023
Type
Culvert
Concrete
Length
258 ft
27 main spans
Daily traffic
6,348
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Binz-Engleman RD over Rosillo Creek is a concrete culvert carrying Binz-Engleman RD over Rosillo Creek in Bexar County, Texas. It was built in 1985, so it is 40 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,348 vehicles a day, projected to reach 6,000 by 2033. The structure is 258 ft (78.6 m) long and 32 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesBinz-Engleman RD
CrossesRosillo Creek
Location0.20 MI E of Ackerman RD
RouteCity Street 0
StateTexas
Coordinates29.45969, -98.37766
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans27
Design loadUnknown
Structure length258 ft (78.6 m)
Longest span9 ft (2.7 m)
Deck width32 ft (9.8 m)
Roadway width31 ft (9.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,348 (2023)
Projected traffic6,000 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Binz-Engleman RD over Rosillo Creek built?

It was built in 1985, making it 40 years old in 2025.

What condition is Binz-Engleman RD over Rosillo Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does Binz-Engleman RD over Rosillo Creek carry?

About 6,348 vehicles per day (2023 count).

How long is Binz-Engleman RD over Rosillo Creek?

The structure is 258 ft (78.6 m) long with a longest span of 9 ft (2.7 m) and a deck 32 ft wide.

Who owns Binz-Engleman RD over Rosillo Creek?

It is owned by the City or Municipal Highway Agency.