Wurzbach Pkwy over Salado CR Jones Maltsbr
GoodBexar County, Texas · 1.00 MI E of US 281 · Structure no. 150150B38105056
- Built
- 2015
- 10 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 2,372 ft
- 19 main spans
- Daily traffic
- 43,472
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Wurzbach Pkwy over Salado CR Jones Maltsbr is a prestressed concrete stringer/multi-beam or girder carrying Wurzbach Pkwy over Salado CR Jones Maltsbr in Bexar County, Texas. It was built in 2015, so it is 10 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 43,472 vehicles a day, roughly 1% of them trucks, projected to reach 14,000 by 2036. The structure is 2,372 ft (723 m) long and 82 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Wurzbach Pkwy over Salado CR Jones Maltsbr built?
It was built in 2015, making it 10 years old in 2025.
What condition is Wurzbach Pkwy over Salado CR Jones Maltsbr in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does Wurzbach Pkwy over Salado CR Jones Maltsbr carry?
About 43,472 vehicles per day (2023 count), of which roughly 1% are trucks.
How long is Wurzbach Pkwy over Salado CR Jones Maltsbr?
The structure is 2,372 ft (723 m) long with a longest span of 124 ft (37.8 m) and a deck 82 ft wide.
Who owns Wurzbach Pkwy over Salado CR Jones Maltsbr?
It is owned by the City or Municipal Highway Agency.