US Bridges

Wurzbach Pky EB over Thousand Oaks DR

Good

Bexar County, Texas · 1.05 MI E Perrin Beitel · Structure no. 150150B38105021

Built
1999
26 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
280 ft
3 main spans
Daily traffic
18,615
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Wurzbach Pky EB over Thousand Oaks DR is a prestressed concrete stringer/multi-beam or girder carrying Wurzbach Pky EB over Thousand Oaks DR in Bexar County, Texas. It was built in 1999, so it is 26 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 18,615 vehicles a day, roughly 1% of them trucks, projected to reach 25,000 by 2031. The structure is 280 ft (85.3 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWurzbach Pky EB
CrossesThousand Oaks DR
Location1.05 MI E Perrin Beitel
RouteCity Street 0
StateTexas
Coordinates29.53571, -98.39441
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length280 ft (85.3 m)
Longest span110 ft (33.5 m)
Deck width41 ft (12.6 m)
Roadway width33 ft (10.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,615 (2023)
Projected traffic25,000 by 2031
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Wurzbach Pky EB over Thousand Oaks DR built?

It was built in 1999, making it 26 years old in 2025.

What condition is Wurzbach Pky EB over Thousand Oaks DR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Wurzbach Pky EB over Thousand Oaks DR carry?

About 18,615 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is Wurzbach Pky EB over Thousand Oaks DR?

The structure is 280 ft (85.3 m) long with a longest span of 110 ft (33.5 m) and a deck 41 ft wide.

Who owns Wurzbach Pky EB over Thousand Oaks DR?

It is owned by the City or Municipal Highway Agency.