US Bridges

Woodlake Pkwy over Rosillo Creek

Good

Bexar County, Texas · 0.15 MI S of Eisenhauer · Structure no. 150150B37965001

Built
1990
35 years old
Condition
Good
inspected May 2023
Type
Culvert
Concrete
Length
44 ft
5 main spans
Daily traffic
3,000
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Woodlake Pkwy over Rosillo Creek is a concrete culvert carrying Woodlake Pkwy over Rosillo Creek in Bexar County, Texas. It was built in 1990, so it is 35 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,000 vehicles a day, projected to reach 2,000 by 2033. The structure is 44 ft (13.4 m) long and 68 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesWoodlake Pkwy
CrossesRosillo Creek
Location0.15 MI S of Eisenhauer
RouteCity Street 0
StateTexas
Coordinates29.50111, -98.36806
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans5
Design loadUnknown
Structure length44 ft (13.4 m)
Longest span9 ft (2.7 m)
Deck width68 ft (20.6 m)
Roadway width53 ft (16.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,000 (2021)
Projected traffic2,000 by 2033
Trucks0%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Woodlake Pkwy over Rosillo Creek built?

It was built in 1990, making it 35 years old in 2025.

What condition is Woodlake Pkwy over Rosillo Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Woodlake Pkwy over Rosillo Creek carry?

About 3,000 vehicles per day (2021 count).

How long is Woodlake Pkwy over Rosillo Creek?

The structure is 44 ft (13.4 m) long with a longest span of 9 ft (2.7 m) and a deck 68 ft wide.

Who owns Woodlake Pkwy over Rosillo Creek?

It is owned by the City or Municipal Highway Agency.