US Bridges

Westwood Lp over Culebra Crk Relief

Good

Bexar County, Texas · 0.30 MI W of Lp 1604 · Structure no. 150150B36771002

Built
2001
24 years old
Condition
Good
inspected June 2023
Type
Culvert
Concrete
Length
128 ft
15 main spans
Daily traffic
5,000
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Westwood Lp over Culebra Crk Relief is a concrete culvert carrying Westwood Lp over Culebra Crk Relief in Bexar County, Texas. It was built in 2001, so it is 24 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,000 vehicles a day, projected to reach 8,000 by 2042. The structure is 128 ft (39 m) long and 56 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesWestwood Lp
CrossesCulebra Crk Relief
Location0.30 MI W of Lp 1604
RouteCity Street 0
StateTexas
Coordinates29.49855, -98.70719
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans15
Design loadHS 20
Structure length128 ft (39 m)
Longest span8 ft (2.4 m)
Deck width56 ft (17.1 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,000 (2022)
Projected traffic8,000 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Westwood Lp over Culebra Crk Relief built?

It was built in 2001, making it 24 years old in 2025.

What condition is Westwood Lp over Culebra Crk Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Westwood Lp over Culebra Crk Relief carry?

About 5,000 vehicles per day (2022 count).

How long is Westwood Lp over Culebra Crk Relief?

The structure is 128 ft (39 m) long with a longest span of 8 ft (2.4 m) and a deck 56 ft wide.

Who owns Westwood Lp over Culebra Crk Relief?

It is owned by the City or Municipal Highway Agency.