US Bridges

Weidner Road over Perrin Beitel Creek

Good

Bexar County, Texas · 0.60 MI S Old Oconnor · Structure no. 150150B36405001

Built
2011
14 years old
Condition
Good
inspected May 2023
Type
Culvert
Concrete
Length
86 ft
5 main spans
Daily traffic
8,996
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Weidner Road over Perrin Beitel Creek is a concrete culvert carrying Weidner Road over Perrin Beitel Creek in Bexar County, Texas. It was built in 2011, so it is 14 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,996 vehicles a day, projected to reach 8,927 by 2033. The structure is 86 ft (26.2 m) long and 46 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesWeidner Road
CrossesPerrin Beitel Creek
Location0.60 MI S Old Oconnor
RouteCity Street 0
StateTexas
Coordinates29.54799, -98.3823
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, precast panels
Main spans5
Design loadHL 93
Structure length86 ft (26.2 m)
Longest span10 ft (3 m)
Deck width46 ft (13.9 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,996 (2020)
Projected traffic8,927 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Weidner Road over Perrin Beitel Creek built?

It was built in 2011, making it 14 years old in 2025.

What condition is Weidner Road over Perrin Beitel Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Weidner Road over Perrin Beitel Creek carry?

About 8,996 vehicles per day (2020 count).

How long is Weidner Road over Perrin Beitel Creek?

The structure is 86 ft (26.2 m) long with a longest span of 10 ft (3 m) and a deck 46 ft wide.

Who owns Weidner Road over Perrin Beitel Creek?

It is owned by the City or Municipal Highway Agency.