US Bridges

Timber Path over Draw

Good

Bexar County, Texas · 0.03 MI E of Harrison DR · Structure no. 150150B34267004

Built
1981
44 years old
Condition
Good
inspected June 2023
Type
Culvert
Concrete
Length
29 ft
3 main spans
Daily traffic
5,688
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Timber Path over Draw is a concrete culvert carrying Timber Path over Draw in Bexar County, Texas. It was built in 1981, so it is 44 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,688 vehicles a day, projected to reach 7,500 by 2042. The structure is 29 ft (8.8 m) long and 55 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesTimber Path
CrossesDraw
Location0.03 MI E of Harrison DR
RouteCity Street 0
StateTexas
Coordinates29.49296, -98.69146
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length29 ft (8.8 m)
Longest span9 ft (2.7 m)
Deck width55 ft (16.8 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,688 (2020)
Projected traffic7,500 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Timber Path over Draw built?

It was built in 1981, making it 44 years old in 2025.

What condition is Timber Path over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Timber Path over Draw carry?

About 5,688 vehicles per day (2020 count).

How long is Timber Path over Draw?

The structure is 29 ft (8.8 m) long with a longest span of 9 ft (2.7 m) and a deck 55 ft wide.

Who owns Timber Path over Draw?

It is owned by the City or Municipal Highway Agency.