US Bridges

Ruiz ST over Martinez Creek

Fair

Bexar County, Texas · 0.10 MI W of San Jacinto · Structure no. 150150B29815004

Built
1965
60 years old
Condition
Fair
inspected August 2023
Type
Slab
Concrete Continuous
Length
131 ft
4 main spans
Daily traffic
2,705
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Ruiz ST over Martinez Creek is a concrete continuous slab carrying Ruiz ST over Martinez Creek in Bexar County, Texas. It was built in 1965, so it is 60 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,705 vehicles a day, projected to reach 5,300 by 2039. The structure is 131 ft (39.9 m) long and 54 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRuiz ST
CrossesMartinez Creek
Location0.10 MI W of San Jacinto
RouteCity Street 0
StateTexas
Coordinates29.43553, -98.51644
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55 US tons
Inventory rating33 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length131 ft (39.9 m)
Longest span34 ft (10.4 m)
Deck width54 ft (16.5 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,705 (2020)
Projected traffic5,300 by 2039
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$138,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Ruiz ST over Martinez Creek built?

It was built in 1965, making it 60 years old in 2025.

What condition is Ruiz ST over Martinez Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does Ruiz ST over Martinez Creek carry?

About 2,705 vehicles per day (2020 count).

How long is Ruiz ST over Martinez Creek?

The structure is 131 ft (39.9 m) long with a longest span of 34 ft (10.4 m) and a deck 54 ft wide.

Who owns Ruiz ST over Martinez Creek?

It is owned by the City or Municipal Highway Agency.