Roland RD over West Branch Salado Crk
GoodBexar County, Texas · 0.90 MI SE of US 87 · Structure no. 150150B29355004
- Built
- 2015
- 10 years old
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 593 ft
- 6 main spans
- Daily traffic
- 4,021
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Roland RD over West Branch Salado Crk is a prestressed concrete stringer/multi-beam or girder carrying Roland RD over West Branch Salado Crk in Bexar County, Texas. It was built in 2015, so it is 10 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 4,021 vehicles a day, roughly 1% of them trucks, projected to reach 2,500 by 2039. The structure is 593 ft (180.7 m) long and 50 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Roland RD over West Branch Salado Crk built?
It was built in 2015, making it 10 years old in 2025.
What condition is Roland RD over West Branch Salado Crk in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does Roland RD over West Branch Salado Crk carry?
About 4,021 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is Roland RD over West Branch Salado Crk?
The structure is 593 ft (180.7 m) long with a longest span of 108 ft (32.9 m) and a deck 50 ft wide.
Who owns Roland RD over West Branch Salado Crk?
It is owned by the City or Municipal Highway Agency.