US Bridges

E Rector over Drain

Fair

Bexar County, Texas · 0.15 MI E Jones Mltzbrgr · Structure no. 150150B28760001

Built
2000
25 years old
Condition
Fair
inspected June 2023
Type
Culvert
Concrete
Length
64 ft
6 main spans
Daily traffic
4,034
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

E Rector over Drain is a concrete culvert carrying E Rector over Drain in Bexar County, Texas. It was built in 2000, so it is 25 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,034 vehicles a day, roughly 1% of them trucks, projected to reach 1,500 by 2038. The structure is 64 ft (19.5 m) long and 60 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesE Rector
CrossesDrain
Location0.15 MI E Jones Mltzbrgr
RouteCity Street 0
StateTexas
Coordinates29.51703, -98.48172
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans6
Design loadUnknown
Structure length64 ft (19.5 m)
Longest span10 ft (3 m)
Deck width60 ft (18.3 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,034 (2020)
Projected traffic1,500 by 2038
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was E Rector over Drain built?

It was built in 2000, making it 25 years old in 2025.

What condition is E Rector over Drain in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does E Rector over Drain carry?

About 4,034 vehicles per day (2020 count), of which roughly 1% are trucks.

How long is E Rector over Drain?

The structure is 64 ft (19.5 m) long with a longest span of 10 ft (3 m) and a deck 60 ft wide.

Who owns E Rector over Drain?

It is owned by the City or Municipal Highway Agency.