US Bridges

Enrique Barrera Pw over Trib of Leon CR

Good

Bexar County, Texas · 0.45 MI NE of US 90 · Structure no. 150150B25553002

Built
2012
13 years old
Condition
Good
inspected August 2023
Type
Culvert
Concrete
Length
50 ft
4 main spans
Daily traffic
8,937
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Enrique Barrera Pw over Trib of Leon CR is a concrete culvert carrying Enrique Barrera Pw over Trib of Leon CR in Bexar County, Texas. It was built in 2012, so it is 13 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,937 vehicles a day, roughly 2% of them trucks, projected to reach 12,700 by 2033. The structure is 50 ft (15.2 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesEnrique Barrera Pw
CrossesTrib of Leon CR
Location0.45 MI NE of US 90
RouteCity Street 8068
StateTexas
Coordinates29.40787, -98.61546
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadUnknown
Structure length50 ft (15.2 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,937 (2020)
Projected traffic12,700 by 2033
Trucks2%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Enrique Barrera Pw over Trib of Leon CR built?

It was built in 2012, making it 13 years old in 2025.

What condition is Enrique Barrera Pw over Trib of Leon CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Enrique Barrera Pw over Trib of Leon CR carry?

About 8,937 vehicles per day (2020 count), of which roughly 2% are trucks.

How long is Enrique Barrera Pw over Trib of Leon CR?

The structure is 50 ft (15.2 m) long with a longest span of 10 ft (3 m).

Who owns Enrique Barrera Pw over Trib of Leon CR?

It is owned by the City or Municipal Highway Agency.