US Bridges

S Josephine-Tobin over Woodlawn Lake

Fair

Bexar County, Texas · 0.01 MI S of Woodlawn Ave · Structure no. 150150B17935005

Built
2015
10 years old
Condition
Fair
inspected May 2023
Type
Other
Prestressed Concrete
Length
192 ft
4 main spans
Daily traffic
8,644
2015 count
Owner
City
City or Municipal Highway Agency

About this bridge

S Josephine-Tobin over Woodlawn Lake is a prestressed concrete other carrying S Josephine-Tobin over Woodlawn Lake in Bexar County, Texas. It was built in 2015, so it is 10 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 8,644 vehicles a day, projected to reach 10,000 by 2032. The structure is 192 ft (58.5 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesS Josephine-Tobin
CrossesWoodlawn Lake
Location0.01 MI S of Woodlawn Ave
RouteCity Street 0
StateTexas
Coordinates29.45455, -98.53526
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeOther
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length192 ft (58.5 m)
Longest span48 ft (14.6 m)
Deck width59 ft (18.1 m)
Roadway width41 ft (12.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,644 (2015)
Projected traffic10,000 by 2032
Trucks0%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S Josephine-Tobin over Woodlawn Lake built?

It was built in 2015, making it 10 years old in 2025.

What condition is S Josephine-Tobin over Woodlawn Lake in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does S Josephine-Tobin over Woodlawn Lake carry?

About 8,644 vehicles per day (2015 count).

How long is S Josephine-Tobin over Woodlawn Lake?

The structure is 192 ft (58.5 m) long with a longest span of 48 ft (14.6 m) and a deck 59 ft wide.

Who owns S Josephine-Tobin over Woodlawn Lake?

It is owned by the City or Municipal Highway Agency.