Jones Maltsberger over Lorence Creek
GoodBexar County, Texas · 0.8 MI S of Thousand Oaks · Structure no. 150150B17905001
- Built
- 1985
- 40 years old
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 444 ft
- 4 main spans
- Daily traffic
- 6,797
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Jones Maltsberger over Lorence Creek is a prestressed concrete stringer/multi-beam or girder carrying Jones Maltsberger over Lorence Creek in Bexar County, Texas. It was built in 1985, so it is 40 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,797 vehicles a day, projected to reach 10 by 2031. The structure is 444 ft (135.3 m) long and 56 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Jones Maltsberger over Lorence Creek built?
It was built in 1985, making it 40 years old in 2025.
What condition is Jones Maltsberger over Lorence Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does Jones Maltsberger over Lorence Creek carry?
About 6,797 vehicles per day (2020 count).
How long is Jones Maltsberger over Lorence Creek?
The structure is 444 ft (135.3 m) long with a longest span of 74 ft (22.6 m) and a deck 56 ft wide.
Who owns Jones Maltsberger over Lorence Creek?
It is owned by the City or Municipal Highway Agency.