US Bridges

Hardy Oaks Blvd over Draw

Good

Bexar County, Texas · 1.80 MI N of Stone Oak · Structure no. 150150B15354002

Built
2002
23 years old
Condition
Good
inspected July 2023
Type
Culvert
Concrete
Length
71 ft
8 main spans
Daily traffic
6,946
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Hardy Oaks Blvd over Draw is a concrete culvert carrying Hardy Oaks Blvd over Draw in Bexar County, Texas. It was built in 2002, so it is 23 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,946 vehicles a day, projected to reach 5,000 by 2035. The structure is 71 ft (21.6 m) long and 64 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesHardy Oaks Blvd
CrossesDraw
Location1.80 MI N of Stone Oak
RouteCity Street 0
StateTexas
Coordinates29.66189, -98.50312
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans8
Design loadUnknown
Structure length71 ft (21.6 m)
Longest span9 ft (2.7 m)
Deck width64 ft (19.5 m)
Roadway width45 ft (13.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,946 (2020)
Projected traffic5,000 by 2035
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$8,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Hardy Oaks Blvd over Draw built?

It was built in 2002, making it 23 years old in 2025.

What condition is Hardy Oaks Blvd over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Hardy Oaks Blvd over Draw carry?

About 6,946 vehicles per day (2020 count).

How long is Hardy Oaks Blvd over Draw?

The structure is 71 ft (21.6 m) long with a longest span of 9 ft (2.7 m) and a deck 64 ft wide.

Who owns Hardy Oaks Blvd over Draw?

It is owned by the City or Municipal Highway Agency.