US Bridges

Camp St. over San Pedro Creek

Good

Bexar County, Texas · 0.1 MI E of IH 35 · Structure no. 150150B05360002

Built
2023
2 years old
Condition
Good
inspected August 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
121 ft
1 main span
Daily traffic
1,350
2011 count
Owner
City
City or Municipal Highway Agency

About this bridge

Camp St. over San Pedro Creek is a prestressed concrete box beam or girders - multiple carrying Camp St. over San Pedro Creek in Bexar County, Texas. It was built in 2023, so it is 2 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,350 vehicles a day, projected to reach 1 by 1900. The structure is 121 ft (36.9 m) long and 48 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesCamp St.
CrossesSan Pedro Creek
Location0.1 MI E of IH 35
RouteCity Street 0
StateTexas
Coordinates29.41353, -98.50239
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1 (+2 approach)
Design loadUnknown
Structure length121 ft (36.9 m)
Longest span42 ft (12.8 m)
Deck width48 ft (14.5 m)
Roadway width29 ft (8.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,350 (2011)
Projected traffic1 by 1900
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Camp St. over San Pedro Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is Camp St. over San Pedro Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Camp St. over San Pedro Creek carry?

About 1,350 vehicles per day (2011 count).

How long is Camp St. over San Pedro Creek?

The structure is 121 ft (36.9 m) long with a longest span of 42 ft (12.8 m) and a deck 48 ft wide.

Who owns Camp St. over San Pedro Creek?

It is owned by the City or Municipal Highway Agency.