US Bridges

Talley Rd. over Medio Creek

Good

Bexar County, Texas · 1.25 MI N of FM 1957 · Structure no. 150150AA2793009

Built
2022
3 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
240 ft
3 main spans
Daily traffic
8,351
2020 count
Owner
County
County Highway Agency

About this bridge

Talley Rd. over Medio Creek is a prestressed concrete stringer/multi-beam or girder carrying Talley Rd. over Medio Creek in Bexar County, Texas. It was built in 2022, so it is 3 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,351 vehicles a day, roughly 3% of them trucks, projected to reach 11,691 by 2041. The structure is 240 ft (73.2 m) long and 77 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTalley Rd.
CrossesMedio Creek
Location1.25 MI N of FM 1957
RouteCounty Highway 0
StateTexas
Coordinates29.44624, -98.75239
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.9 US tons
Inventory rating30 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length240 ft (73.2 m)
Longest span80 ft (24.4 m)
Deck width77 ft (23.6 m)
Roadway width64 ft (19.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,351 (2020)
Projected traffic11,691 by 2041
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Talley Rd. over Medio Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is Talley Rd. over Medio Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Talley Rd. over Medio Creek carry?

About 8,351 vehicles per day (2020 count), of which roughly 3% are trucks.

How long is Talley Rd. over Medio Creek?

The structure is 240 ft (73.2 m) long with a longest span of 80 ft (24.4 m) and a deck 77 ft wide.

Who owns Talley Rd. over Medio Creek?

It is owned by the County Highway Agency.