Senior Road over Elm Creek
FairBexar County, Texas · 1.50 MI S of FM 2790 · Structure no. 150150AA0765002
- Built
- 1927
- 98 years old, rebuilt 1979
- Condition
- Fair
- inspected August 2023
- Type
- Tee Beam
- Concrete
- Length
- 93 ft
- 3 main spans
- Daily traffic
- 763
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
Senior Road over Elm Creek is a concrete tee beam carrying Senior Road over Elm Creek in Bexar County, Texas. It was built in 1927 and reconstructed in 1979, so it is 98 years old, older than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 763 vehicles a day, projected to reach 1,320 by 2027. The structure is 93 ft (28.3 m) long and 33 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Senior Road over Elm Creek built?
It was built in 1927, making it 98 years old in 2025. It was reconstructed in 1979.
What condition is Senior Road over Elm Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Senior Road over Elm Creek carry?
About 763 vehicles per day (2015 count).
How long is Senior Road over Elm Creek?
The structure is 93 ft (28.3 m) long with a longest span of 31 ft (9.4 m) and a deck 33 ft wide.
Who owns Senior Road over Elm Creek?
It is owned by the County Highway Agency.