US Bridges

E Evans RD over Draw

Good

Bexar County, Texas · 1.90 MI E of Bulverde RD · Structure no. 150150AA0626001

Built
2002
23 years old, rebuilt 2021
Condition
Good
inspected July 2023
Type
Culvert
Concrete
Length
180 ft
12 main spans
Daily traffic
10,288
2020 count
Owner
County
County Highway Agency

About this bridge

E Evans RD over Draw is a concrete culvert carrying E Evans RD over Draw in Bexar County, Texas. It was built in 2002 and reconstructed in 2021, so it is 23 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,288 vehicles a day, projected to reach 3,200 by 2027. The structure is 180 ft (54.9 m) long and 64 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesE Evans RD
CrossesDraw
Location1.90 MI E of Bulverde RD
RouteCounty Highway 0
StateTexas
Coordinates29.64381, -98.39494
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans12
Design loadUnknown
Structure length180 ft (54.9 m)
Longest span10 ft (3 m)
Deck width64 ft (19.5 m)
Roadway width56 ft (17.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,288 (2020)
Projected traffic3,200 by 2027
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was E Evans RD over Draw built?

It was built in 2002, making it 23 years old in 2025. It was reconstructed in 2021.

What condition is E Evans RD over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does E Evans RD over Draw carry?

About 10,288 vehicles per day (2020 count).

How long is E Evans RD over Draw?

The structure is 180 ft (54.9 m) long with a longest span of 10 ft (3 m) and a deck 64 ft wide.

Who owns E Evans RD over Draw?

It is owned by the County Highway Agency.