SH 211 over Protranca Creek
GoodBexar County, Texas · 0.800 MI NW of FM 1957 · Structure no. 150150354404177
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 240 ft
- 3 main spans
- Daily traffic
- 20,800
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
SH 211 over Protranca Creek is a prestressed concrete stringer/multi-beam or girder carrying SH 211 over Protranca Creek in Bexar County, Texas. It was built in 2022, so it is 3 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 20,800 vehicles a day, roughly 8% of them trucks, projected to reach 1 by 1900. The structure is 240 ft (73.2 m) long and 42 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 211 over Protranca Creek built?
It was built in 2022, making it 3 years old in 2025.
What condition is SH 211 over Protranca Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does SH 211 over Protranca Creek carry?
About 20,800 vehicles per day (2020 count), of which roughly 8% are trucks.
How long is SH 211 over Protranca Creek?
The structure is 240 ft (73.2 m) long with a longest span of 80 ft (24.4 m) and a deck 42 ft wide.
Who owns SH 211 over Protranca Creek?
It is owned by the State Highway Agency.