US Bridges

Lp 1604 over Trib of Huesta Creek

Good

Bexar County, Texas · 0.90 MI NE of FM 1560 · Structure no. 150150245202011

Built
1993
32 years old
Condition
Good
inspected May 2024
Type
Culvert
Concrete
Length
96 ft
9 main spans
Daily traffic
84,499
2020 count
Owner
State
State Highway Agency

About this bridge

Lp 1604 over Trib of Huesta Creek is a concrete culvert carrying Lp 1604 over Trib of Huesta Creek in Bexar County, Texas. It was built in 1993, so it is 32 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 84,499 vehicles a day, roughly 9% of them trucks, projected to reach 109,120 by 2033. The structure is 96 ft (29.3 m) long.

CarriesLp 1604
CrossesTrib of Huesta Creek
Location0.90 MI NE of FM 1560
RouteState Highway 1604
StateTexas
Coordinates29.58019, -98.64239
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans9
Design loadHS 20
Structure length96 ft (29.3 m)
Longest span8 ft (2.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic84,499 (2020)
Projected traffic109,120 by 2033
Trucks9%
Lanes on structure10
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lp 1604 over Trib of Huesta Creek built?

It was built in 1993, making it 32 years old in 2025.

What condition is Lp 1604 over Trib of Huesta Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Lp 1604 over Trib of Huesta Creek carry?

About 84,499 vehicles per day (2020 count), of which roughly 9% are trucks.

How long is Lp 1604 over Trib of Huesta Creek?

The structure is 96 ft (29.3 m) long with a longest span of 8 ft (2.4 m).

Who owns Lp 1604 over Trib of Huesta Creek?

It is owned by the State Highway Agency.