US Bridges

IH 410 Nbml over SH 151 Ebfr

Good

Bexar County, Texas · 2.4 MI N of US 90 · Structure no. 150150052104261

Built
1988
37 years old, rebuilt 2022
Condition
Good
inspected June 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
140 ft
1 main span
Daily traffic
30,955
2017 count
Owner
State
State Highway Agency

About this bridge

IH 410 Nbml over SH 151 Ebfr is a prestressed concrete stringer/multi-beam or girder carrying IH 410 Nbml over SH 151 Ebfr in Bexar County, Texas. It was built in 1988 and reconstructed in 2022, so it is 37 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30,955 vehicles a day, roughly 16% of them trucks, projected to reach 48,270 by 2033. The structure is 140 ft (42.7 m) long and 67 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIH 410 Nbml
CrossesSH 151 Ebfr
Location2.4 MI N of US 90
RouteInterstate 410
StateTexas
Coordinates29.43265, -98.64679
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1 (+2 approach)
Design loadHS 20
Structure length140 ft (42.7 m)
Longest span60 ft (18.3 m)
Deck width67 ft (20.4 m)
Roadway width65 ft (19.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30,955 (2017)
Projected traffic48,270 by 2033
Trucks16%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 410 Nbml over SH 151 Ebfr built?

It was built in 1988, making it 37 years old in 2025. It was reconstructed in 2022.

What condition is IH 410 Nbml over SH 151 Ebfr in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2022.

How much traffic does IH 410 Nbml over SH 151 Ebfr carry?

About 30,955 vehicles per day (2017 count), of which roughly 16% are trucks.

How long is IH 410 Nbml over SH 151 Ebfr?

The structure is 140 ft (42.7 m) long with a longest span of 60 ft (18.3 m) and a deck 67 ft wide.

Who owns IH 410 Nbml over SH 151 Ebfr?

It is owned by the State Highway Agency.