US Bridges

IH 410 EB FR over Drain

Fair

Bexar County, Texas · 0.20 MI E of FM 1535 · Structure no. 150150052104027

Built
1957
68 years old, rebuilt 2002
Condition
Fair
inspected July 2024
Type
Culvert
Concrete
Length
65 ft
10 main spans
Daily traffic
6,710
2022 count
Owner
State
State Highway Agency

About this bridge

IH 410 EB FR over Drain is a concrete culvert carrying IH 410 EB FR over Drain in Bexar County, Texas. It was built in 1957 and reconstructed in 2002, so it is 68 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,710 vehicles a day, roughly 3% of them trucks, projected to reach 9,394 by 2042. The structure is 65 ft (19.8 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIH 410 EB FR
CrossesDrain
Location0.20 MI E of FM 1535
RouteState Highway 410
StateTexas
Coordinates29.51971, -98.51031
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44.6 US tons
Inventory rating26.6 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans10
Design loadOther
Structure length65 ft (19.8 m)
Longest span6 ft (1.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,710 (2022)
Projected traffic9,394 by 2042
Trucks3%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IH 410 EB FR over Drain built?

It was built in 1957, making it 68 years old in 2025. It was reconstructed in 2002.

What condition is IH 410 EB FR over Drain in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does IH 410 EB FR over Drain carry?

About 6,710 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is IH 410 EB FR over Drain?

The structure is 65 ft (19.8 m) long with a longest span of 6 ft (1.8 m).

Who owns IH 410 EB FR over Drain?

It is owned by the State Highway Agency.