US Bridges

Poplar /Cypress ST over San Pedro Creek

Good

Bexar County, Texas · At Camaron ST Int · Structure no. 150150007212277

Built
1993
32 years old, rebuilt 1996
Condition
Good
inspected July 2024
Type
Slab
Concrete Continuous
Length
57 ft
2 main spans
Daily traffic
309
2020 count
Owner
State
State Highway Agency

About this bridge

Poplar /Cypress ST over San Pedro Creek is a concrete continuous slab carrying Poplar /Cypress ST over San Pedro Creek in Bexar County, Texas. It was built in 1993 and reconstructed in 1996, so it is 32 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 309 vehicles a day, roughly 3% of them trucks, projected to reach 309 by 2042. The structure is 57 ft (17.4 m) long and 124 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPoplar /Cypress ST
CrossesSan Pedro Creek
LocationAt Camaron ST Int
RouteInterstate 10
StateTexas
Coordinates29.43916, -98.5048
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length57 ft (17.4 m)
Longest span29 ft (8.8 m)
Deck width124 ft (37.8 m)
Roadway width59 ft (18 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic309 (2020)
Projected traffic309 by 2042
Trucks3%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$932,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Poplar /Cypress ST over San Pedro Creek built?

It was built in 1993, making it 32 years old in 2025. It was reconstructed in 1996.

What condition is Poplar /Cypress ST over San Pedro Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Poplar /Cypress ST over San Pedro Creek carry?

About 309 vehicles per day (2020 count), of which roughly 3% are trucks.

How long is Poplar /Cypress ST over San Pedro Creek?

The structure is 57 ft (17.4 m) long with a longest span of 29 ft (8.8 m) and a deck 124 ft wide.

Who owns Poplar /Cypress ST over San Pedro Creek?

It is owned by the State Highway Agency.