IH 10 WB Upper Lev over Fredericksburg - Poplar
FairBexar County, Texas · Mulberry to Frio ST · Structure no. 150150007212206
- Built
- 1989
- 36 years old
- Condition
- Fair
- inspected July 2024
- Type
- Segmental Box Girder
- Prestressed Concrete Continuous
- Length
- 8,955 ft
- 68 main spans
- Daily traffic
- 81,813
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
IH 10 WB Upper Lev over Fredericksburg - Poplar is a prestressed concrete continuous segmental box girder carrying IH 10 WB Upper Lev over Fredericksburg - Poplar in Bexar County, Texas. It was built in 1989, so it is 36 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 81,813 vehicles a day, roughly 6% of them trucks, projected to reach 122,720 by 2042. The structure is 8,955 ft (2,729.5 m) long and 61 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 10 WB Upper Lev over Fredericksburg - Poplar built?
It was built in 1989, making it 36 years old in 2025.
What condition is IH 10 WB Upper Lev over Fredericksburg - Poplar in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does IH 10 WB Upper Lev over Fredericksburg - Poplar carry?
About 81,813 vehicles per day (2023 count), of which roughly 6% are trucks.
How long is IH 10 WB Upper Lev over Fredericksburg - Poplar?
The structure is 8,955 ft (2,729.5 m) long with a longest span of 110 ft (33.5 m) and a deck 61 ft wide.
Who owns IH 10 WB Upper Lev over Fredericksburg - Poplar?
It is owned by the State Highway Agency.