US Bridges

IH 10 EB over Huebner RD

Good

Bexar County, Texas · 3.5 MI S of Lp 1604 · Structure no. 150150007212090

Built
1961
64 years old, rebuilt 1994
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
202 ft
4 main spans
Daily traffic
90,543
2022 count
Owner
State
State Highway Agency

About this bridge

IH 10 EB over Huebner RD is a steel continuous stringer/multi-beam or girder carrying IH 10 EB over Huebner RD in Bexar County, Texas. It was built in 1961 and reconstructed in 1994, so it is 64 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 90,543 vehicles a day, roughly 5% of them trucks, projected to reach 126,761 by 2042. The structure is 202 ft (61.6 m) long and 73 ft wide.

CarriesIH 10 EB
CrossesHuebner RD
Location3.5 MI S of Lp 1604
RouteInterstate 10
StateTexas
Coordinates29.54456, -98.57884
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length202 ft (61.6 m)
Longest span55 ft (16.8 m)
Deck width73 ft (22.4 m)
Roadway width66 ft (20 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic90,543 (2022)
Projected traffic126,761 by 2042
Trucks5%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$1.2 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 10 EB over Huebner RD built?

It was built in 1961, making it 64 years old in 2025. It was reconstructed in 1994.

What condition is IH 10 EB over Huebner RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does IH 10 EB over Huebner RD carry?

About 90,543 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is IH 10 EB over Huebner RD?

The structure is 202 ft (61.6 m) long with a longest span of 55 ft (16.8 m) and a deck 73 ft wide.

Who owns IH 10 EB over Huebner RD?

It is owned by the State Highway Agency.